Corrosion Control in the Plumbing System


To better understand the proper upholding procedures for the elimination and the prevention of the water quality troubles in the plumbing methods, it is just necessary to recognize the procedure being used in determining the chemical fierceness of water. The procedure has been used to identify when the added treatment will be needed. The water that is just out of balance will result in lots of negative outcomes, from the toxic water to ruin and damaged equipment.

The water dissolves and then brings the materials if it is not flooded. A balance between alkalinity, and hardness, pH, and temperature control the ability of the water to make the scale or to soften the materials. When the water is soaked with beneficial or harmless substances like the calcium, then the damage or the threat will be mitigated. The method of Langelier, arise during the early 1930s, has been pertaining to the procedure in the boiler management, swimming pools and municipal water treatment, to give the balance. In this Langelier index, the saturation above .3 is the scale forming, and the saturation under .3 is caustic. The susceptibility of a metal to corrosion will be enumerated: (most susceptible up to least susceptible): zinc, aluminum, cadmium, magnesium, mild steel, stainless steel (active), cast iron, lead-tin solder, gun metal, lead, tin, brass, aluminum bronze, copper, Monel, titanium, copper-nickel alloy, stainless steel (passive), platinum, silver, and gold.

Putting all together the plumbing elements

The plumbing elements that can be placed together are:


  1. Roughed-in dress washer – The cold and the hot copper water drain and lines, vent and the P-trap, and vent for a washer drain. When the house is empty for a while, this P-trap must be filled with the water to shun the sewer gas from coming in the house. Mineral oil that has been added to the water may possibly slow down the loss of liquid in the trap.
  2. Roughed-in sink – Cold and hot water pipes, vent shown and the soil pipe.
  3. Roughed-in bathroom. – The vent for the toilet and the sink, soil pipe, and the cap for toilet bond shown. The plastic or the wax seal shaped that is like a donut can be placed over the cap just before bolting it down to the toilet. The back of the bathtub and fiberglass shower combination.

    The mixing and anti scald of water flow control, cold and hot water lines, vents for the fixture, and the bathtub overflow shown. Within this point in the construction, the insulation can be taken into consideration for this hot water line.
  4. Waste water line and the water service – The Polyethylene water service pipes coming inside the house through a concrete basement wall being shown and the white plastic adapter being illustrated in between these polyethylene water service pipes and the 3/2 inch copper of the water line. The short distance over an adapter is the pressure, decreasing valve and to the right in the water line has been the 4 inches PVC pipes waste water lines.


Related post:

Comments